ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness

Allali, Karam*; Aqil, Said; Belabid, Jabrane
SIMULATION MODELLING PRACTICE AND THEORY2022-4DOI: 10.1016/j.simpat.2021.102455
28被引7阅读
引用收藏
分享

摘要

This paper investigates a multi-objective optimization distributed no-wait permutation flow shop scheduling problem under the constraint of sequence dependent setup time. Our optimization case is minimizing the makespan and maximum tardiness criteria. Therefore, our main objective will be to find the optimal jobs sequence that minimizes a function representing the two criteria of makespan and maximum tardiness. This function will be linearly dependent of these two criteria via a weighting parameter for each criterion. To solve this industrial problem, we propose the mixed integer linear programming (MILP) and a set of efficient metaheuristics solving different size instances. To this end, we suggest three inspired nature metaheuristics: The genetic algorithm (GA), the artificial bee colony (ABC) algorithm and migratory bird optimization (MBO) algorithm. We suggest a total of six new algorithms based on nature inspired metaheuristics. Also, two constructive heuristics are used, the greedy randomized adaptive search procedure (GRASP) and Nawaz-Enscore-Ham (NEH) algorithms. It was revealed that GA algorithm with NEH initialization gives the best results comparing to the other metaheuristics.

学科与关键词

关键词
Distributed no-wait flow shopSequence dependent setup timeInspired nature metaheuristicsMakespan and maximum tardiness
相关
加载中…
  • Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time
    Elissaouy, Oualid*; Allali, KaramRAIRO-OPERATIONS RESEARCH, 2024, 58(1): 373-395.被引 1
  • Improved NSGA-II for energy-efficient distributed no-wait flow-shop with sequence-dependent setup time
    Zeng, Qing-qing; Li, Jun-qing*; Li, Rong-hao; Huang, Ti-hao; Han, Yu-yan; Sang, Hong-yanComplex & Intelligent Systems, 2023, 9(1): 825-849.被引 13
  • Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    Fadaei, M.; Zandieh, M.*ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38(8): 2233-2244.被引 18
查看全部 →

发表信息

论文状态
公开发表
期刊
SIMULATION MODELLING PRACTICE AND THEORY
发表日期
2022-04
卷期
第 116 卷
页码
102455
DOI
10.1016/j.simpat.2021.102455
语言
ENGLISH
期刊等级
3区
成果收录
SCIE

作者

  • A

    Allali, Karam (通讯) (第一作者)

  • A

    Aqil, Said

查看全部 3 位作者收起作者
  • B

    Belabid, Jabrane

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417