Scheduling unrelated machines with job splitting, setup resources and sequence dependency

Avgerinos, Ioannis; Mourtos, Ioannis; Vatikiotis, Stavros*; Zois, Georgios
International Journal of Production Research2023-8-18DOI: 10.1080/00207543.2022.2102948
8被引16阅读
引用收藏
分享

摘要

We examine the parallel machine scheduling problem where a set of jobs are to be processed by a set of unrelated parallel machines. We examine the most general among the variations for which an exact method has been proposed regarding makespan minimisation. This is because, apart from unrelated machines, we allow for (i) job splitting: each job's quantity can be split and processed by multiple machines simultaneously; (ii) sequence- and machine-dependent setup times: the setup time when job j succeeds k is different than the time when k succeeds j and varies also per machine m; and (iii) setup resource constraints: the number of setups that can be performed simultaneously on different machines is restricted. We present novel lower bound formulations and a heuristic that solves instances of up to 1000 jobs in a few minutes at an average gap of less than 20%. Then, we propose a logic-based Benders decomposition, which, coupled with our heuristic, solves instances of up to 200 jobs and 20 machines to near optimality in less than two hours. Our method is used for a broad range of instances from textile manufacturing, thus yielding valuable managerial insights on makespan's versatility under varying machines or resources.

学科与关键词

关键词
Parallel machine schedulingsequence-dependent setup timesjob splittingbenders decompositionheuristicstextile manufacturing
相关
加载中…
  • Unrelated parallel machines scheduling with dependent setup times in textile industry
    Berthier, A.*; Yalaoui, A.; Chehade, H.; Yalaoui, F.; Amodeo, L.; Bouillot, C.COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174: 108736.被引 14
  • Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times
    Yunusoglu, Pinar; Yildiz, Seyda Topaloglu*International Journal of Production Research, 2022, 60(7): 2212-2229.被引 47
  • Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times
    Kim, Jae-Gon; Song, Seokwoo; Jeong, BongJoo*International Journal of Production Research, 2020, 58(6): 1628-1643.被引 38
查看全部 →

发表信息

论文状态
公开发表
期刊
International Journal of Production Research
发表日期
2023-08-18
卷期
第 61 卷, 第 16 期
页码
5502-5524
DOI
10.1080/00207543.2022.2102948
语言
MULTI-LANGUAGE
成果收录
SCIE
资助标注
FACTLOG Horizon 2020 [869951]; H2020 - Industrial Leadership [869951] Funding Source: H2020 - Industrial Leadership

作者

  • A

    Avgerinos, Ioannis (第一作者)

  • M

    Mourtos, Ioannis

查看全部 4 位作者收起作者
  • V

    Vatikiotis, Stavros (通讯)

  • Z

    Zois, Georgios

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417