ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

An Integrated Optimization Method of High-Speed Railway Rescheduling Problem at the Network Level

Zhao, Wenqiang; Zhou, Leishan; Guo, Bin*; Yue, Yixiang; Han, Chang; Wang, Zeyu; Mo, Yuxin北京交通大学
Applied Sciences-Basel2023-10DOI: 10.3390/app131910695
1被引7阅读
引用收藏
分享

摘要

For high-speed railway operations at the network level, unforeseen events that lead to operation interruptions are inevitable, which should be handled within a short period of time to reduce the influence of the events as much as possible. This paper introduces an integrated optimization method to deal with rescheduling problems at the railway network level under emergencies, rescheduling the train timetable, and utilizing the train sets. train set A three-objective optimization model is proposed with the aim of minimizing additional operation costs, total delay, and the number of transfer passengers. Then, an algorithm based on NSGA-III is proposed to solve the model. Computational experiments on real data are conducted to show the adaptability of the model and algorithm. The average optimization rate of the three objectives is 12.12%, 14.12%, and 10.57%, indicating the effectiveness of the method. Moreover, more experiments on a railway network in China are being conducted to analyze which section and which time have the greatest impact on the railway network when emergencies occur. According to the experiment, the bottleneck section is section 15, and the bottleneck time is 11:00 am. In addition, the importance of all the depots is discussed, and depot II is selected as the most important depot.

学科与关键词

关键词
high-speed railway networktrain reschedulingemergency managementintegrated optimization method
相关
加载中…
  • Train rescheduling in a major disruption on a high-speed railway network with seat reservation
    Zhan, Shuguang*; Wong, S. C.; Shang, Pan; Lo, S. M.2022, 18(3): 532-567.被引 14
  • Energy-efficient high-speed train rescheduling during a major disruption
    Zhan, Shuguang*; Wang, Pengling*; Wong, S. C.; Lo, S. M.TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 157: 102492.被引 16
  • A Two-stage Stochastic Programming Approach for Timetable Rescheduling with Reassignment of Rolling Stock under Uncertain Disruptions
    Liu, Xuan; Zhou, Min*; Ma, Jianjun; Wang, Bin; Zhan, Shuguang; Dong, HairongIEEE 25th International Conference on Intelligent Transportation Systems (ITSC), Macau, PEOPLES R CHINA, 2022-10-08 To 2022-10-12.被引 2
查看全部 →

发表信息

论文状态
公开发表
期刊
Applied Sciences-Basel
发表日期
2023-10
卷期
第 13 卷, 第 19 期
页码
10695
DOI
10.3390/app131910695
语言
ENGLISH
成果收录
SCIE
资助标注
The authors would like to express great appreciation to editors and reviewers for their positive and constructive comments. And thanks are due to Hanxiao Zhou for data curation and funding acquisition.

作者

  • Z

    Zhao, Wenqiang (第一作者)

    beijing jiaotong univ

  • Z

    Zhou, Leishan

    beijing jiaotong univ

查看全部 7 位作者收起作者
  • G

    Guo, Bin (通讯)

    beijing jiaotong univ

  • Y

    Yue, Yixiang

    beijing jiaotong univ

  • H

    Han, Chang

    beijing jiaotong univ

  • W

    Wang, Zeyu

  • M

    Mo, Yuxin

    beijing jiaotong univ

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417