ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning

Pham, Vu Hong Son; Dang, Nghiep Trinh Nguyen*; Nam, Nguyen Van
Engineering Construction and Architectural Management2024-5-13DOI: 10.1108/ECAM-07-2023-0672
1被引27阅读
引用收藏
分享

摘要

PurposeFor successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this study is to present an innovative approach tailored to tackle the challenges posed by time-cost trade-off (TCTO) problems. This objective is achieved through the integration of the multi-verse optimizer (MVO) with opposition-based learning (OBL), thereby introducing a groundbreaking methodology in the field.Design/methodology/approachThe paper aims to develop a new hybrid meta-heuristic algorithm. This is achieved by integrating the MVO with OBL, thereby forming the iMVO algorithm. The integration enhances the optimization capabilities of the algorithm, notably in terms of exploration and exploitation. Consequently, this results in expedited convergence and yields more accurate solutions. The efficacy of the iMVO algorithm will be evaluated through its application to four different TCTO problems. These problems vary in scale - small, medium and large - and include real-life case studies that possess complex relationships.FindingsThe efficacy of the proposed methodology is evaluated by examining TCTO problems, encompassing 18, 29, 69 and 290 activities, respectively. Results indicate that the iMVO provides competitive solutions for TCTO problems in construction projects. It is observed that the algorithm surpasses previous algorithms in terms of both mean deviation percentage (MD) and average running time (ART).Originality/valueThis research represents a significant advancement in the field of meta-heuristic algorithms, particularly in their application to managing TCTO in construction projects. It is noteworthy for being among the few studies that integrate the MVO with OBL for the management of TCTO in construction projects characterized by complex relationships.

学科与关键词

关键词
Evolutionary algorithmMulti-verse optimizerProject managementOpposition-based learningTime-cost trade-off
相关
加载中…

文献加载失败,请重试

重试

发表信息

论文状态
公开发表
期刊
Engineering Construction and Architectural Management
发表日期
2024-05-13
DOI
10.1108/ECAM-07-2023-0672
成果收录
SCIE
资助标注
Ho Chi Minh City University of Technology (HCMUT); VNU-HCM

作者

  • P

    Pham, Vu Hong Son (第一作者)

  • D

    Dang, Nghiep Trinh Nguyen (通讯)

查看全部 3 位作者收起作者
  • N

    Nam, Nguyen Van

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417