ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

An Interval Parameter Two-Stage Stochastic Approach to Optimize Budget and Schedule in Construction Management

Jinxin, Zhu; Gordon, Huang
Journal of Civil & Environmental Engineering2016DOI: 10.4172/2165-784x.1000228
15阅读
引用收藏
分享
相关
加载中…
  • Conjoint utility analysis of technical maturity and project progress of construction project
    Wei, MaMATEC Web of Conferences, 2016, 63: 02002.
  • Construction management scheduling and control: The familiar historical overview
    Ali, Behnam; Toby, Harfield; Russell, KenleyMATEC Web of Conferences, 2016, 66: 00101.
  • Study on the Information Technology-Based Lean Construction Supply Chain Management Model
    Chen Yan; Xu ZhangongLecture Notes in Electrical Engineering, Springer Berlin Heidelberg, 499-505, 2012.
查看全部 →

发表信息

论文状态
公开发表
期刊
Journal of Civil & Environmental Engineering
发表日期
2016
卷期
第 6 卷, 第 3 期
DOI
10.4172/2165-784x.1000228

作者

  • J

    Jinxin, Zhu (第一作者)

  • G

    Gordon, Huang

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417