ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Human Intervention-Induced Changes in the Characteristics of the Turbidity Maximum Zone and Associated Mouth Bars in the Yangtze Estuary

Li, Weihua*; Jiang, Chenjuan; Zuo, Shuhua; Li, Jiufa*yangzhou univ; tianjin res inst water transport engn
Journal of Marine Science and Engineering2022-5DOI: 10.3390/jmse10050584
1被引12阅读
引用收藏
分享

摘要

In the past two decades, the dynamic sedimentation process of the Yangtze Estuary has been seriously disturbed by coupled human interventions from the river basin to the estuary, especially the impoundment of the Three Gorges Dam in 2003 and the large-scale Deep-water Navigational Channel (DNC) regulation project in 1998-2010. This study investigated the changes in sedimentary dynamic and geomorphological processes in the turbidity maximum zone (TMZ) by analyzing the historical and present data for current, salinity, suspended sediment, and bathymetry. The results show that the decreased riverine sediment input caused a lagging decrease in suspended sediment concentration in the TMZ during the flood seasons. The DNC caused changes in the flow structure, sediment transport, and geometry of the TMZ in the North Passage (NP) and the South Passage (SP). In the NP, decreased ebb transport in the upper reaches led to landward migration of the TMZ during low discharges, while increased ebb transport in the middle and lower reaches caused the seaward migration of the TMZ during high discharges. As the associated topography of the TMZ, the mouth bar in the NP was mostly removed by channel dredging. However, rapid deposition at the location of the previous mouth bar indicates the formation of an incipient bar. In the SP, increased ebb transport after the DNC-induced disappearance of the TMZ and the mouth bar in the upper reaches and the seaward migration of the TMZ in the middle and lower reaches. Therefore, we found that the construction of dams and large-scale estuarine projects changed the sediment dynamics and geomorphological processes of the TMZ and even affected the long-term evolution of the estuary. Construction regulation projects in the TMZ, intended to narrow the cross-section and enhance seaward sediment transport, may produce the opposite effect. Before and after engineering projects, their impacts on estuarine processes need to be carefully estimated.

学科与关键词

关键词
turbidity maximum zonemouth barhuman interventionsdynamic sedimentation processYangtze Estuary
相关
加载中…

文献加载失败,请重试

重试

发表信息

论文状态
公开发表
期刊
Journal of Marine Science and Engineering
发表日期
2022-05
卷期
第 10 卷, 第 5 期
页码
584
DOI
10.3390/jmse10050584
期刊等级
3区
成果收录
SCIE
资助标注
National Natural Science Foundation of China [51761135023, 41806104, U2040202]; Fundamental Research Funds for the Central Universities of China [40500-20105-222050]

作者

  • L

    Li, Weihua (通讯) (第一作者)

  • J

    Jiang, Chenjuan

    yangzhou univ

查看全部 4 位作者收起作者
  • Z

    Zuo, Shuhua

    tianjin res inst water transport engn

  • L

    Li, Jiufa (通讯)

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417