ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

An efficient hybrid differential evolution based serial method for multimode resource-constrained project scheduling

Cheng, Min-Yuan; Tran, Duc-Hoc*
KSCE Journal of Civil Engineering2016-1DOI: 10.1007/s12205-015-0414-0
18被引4阅读
引用收藏
分享

摘要

The Multimode Resource-Constrained (MRC) problem aims at finding the start times and execution modes for the activities of a project that minimizes project duration under current precedence constraints and resource limitations. This study integrates the fuzzy c-means clustering technique and the chaotic technique into the Differential Evolution to develop the Fuzzy Clustering Chaotic-based Differential Evolution (FCDE) algorithm, an efficient hybrid approach to solving MRC and other related problems. Within the FCDE, the chaos prevents the optimization algorithm from premature convergence and the fuzzy c-means clustering acts as several multi-parent crossover operators for utilizing population information efficiently and enhance convergence efficiency. Further, this study applies a serial method to reflect individual-user priorities into the active schedule and the project duration calculations. Experiments run indicate that the proposed FCDE-MRC obtains optimal results more reliably and efficiently than the benchmark algorithms considered. The FCDE-MRC is a promising alternative methodology to handling resource-constrained problems.

学科与关键词

关键词
resource-constrainedfuzzy clusteringchaoticdifferential evolutionconstruction management
相关
加载中…
  • FUZZY CLUSTERING CHAOTIC-BASED DIFFERENTIAL EVOLUTION FOR RESOURCE LEVELING IN CONSTRUCTION PROJECTS
    Cheng, Min-Yuan; Tran, Duc-Hoc*; Hoang, Nhat-DucJournal of Civil Engineering and Management, 2017, 23(1): 113-124.被引 16
  • A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda*; Fortemps, PhilippeEUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 205(1): 31-41.被引 70
  • A two-stage multi-operator differential evolution algorithm for solving Resource Constrained Project Scheduling problems
    Sallam, Karam M.*; Chakrabortty, Ripon K.; Ryan, Michael J.FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2020, 108: 432-444.被引 36
查看全部 →

发表信息

论文状态
公开发表
期刊
KSCE Journal of Civil Engineering
发表日期
2016-01
卷期
第 20 卷, 第 1 期
页码
90-100
DOI
10.1007/s12205-015-0414-0
语言
ENGLISH
成果收录
SCIE

作者

  • C

    Cheng, Min-Yuan (第一作者)

  • T

    Tran, Duc-Hoc (通讯)

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417