摘要
This paper addresses the problem of integrated berth allocation and quay crane (QC) assignment for the trade-off between time-saving and energy-saving. This problem is formulated as a mixed integer programming model (MIP), in order to minimize the total departure delay of all vessels and the total handling energy consumption of all vessels by QCs. Furthermore, an integrated simulation and optimization method is developed, where the simulation is designed for evaluation and optimization algorithm is designed for searching solution space. Finally, numerical experiments are conducted to verify the effectiveness of the proposed method.
学科与关键词
关键词
Berth allocationContainer terminalIntegrated simulationsMixed integer programmingMixed integer programming modelNumerical experimentsOptimization algorithmsQuay cranes
- Berth allocation and quay crane assignment in a container terminal for the trade-off between time-saving and energy-savingHe Junliang*Advanced Engineering Informatics, 2016, 30(3): 390-405.
- Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumptionHe Junliang*; Huang Youfang; Yan Wei; Wang ShuaianExpert Systems with Applications, 2015, 42(5).
- Simulated annealing based simulation optimization method for solving integrated berth allocation and quay crane scheduling problemsTasoglu, Gokcecicek*; Yildiz, GokalpSIMULATION MODELLING PRACTICE AND THEORY, 2019, 97: 101948.被引 32
