ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Supply chain-oriented permutation flowshop scheduling considering flexible assembly and setup times

Ying, Kuo-Ching; Pourhejazy, Pourya; Cheng, Chen-Yang*; Syu, Ren-Siou
International Journal of Production Research2023-1-2DOI: 10.1080/00207543.2020.1842938
31被引8阅读
引用收藏
分享

摘要

Given the significant proportion of the outsourced parts, components, and the complex assembly structure of the automobiles, agriculture machinery and heavy industry equipment, distributed production and flexible assembly are much-needed production scheduling settings to optimise their global supply chains. This research extends the distributed assembly permutation flowshop scheduling problem to account for flexible assembly and sequence-independent setup times (DPFSP_FAST) in a supply chain-like setting. For this purpose, an original mixed-integer linear programming (MILP) formulation to the DPFSP_FAST problem is first investigated. Considering makespan as the optimisation criterion, constructive heuristic and customised metaheuristic algorithms are then proposed to solve this emerging scheduling extension. Through extensive computational experiments, it is shown that the proposed algorithms outperform the existing best-performing algorithms to solve the DPFSP_FAST problem, yielding the best-found solutions in nearly all of the benchmark instances. Narrowing the gap between theory and practice, this study helps integrate the production planning scheduling across the supply chain.

学科与关键词

关键词
Schedulingdistributed manufacturingpermutation flowshopflexible assemblymetaheuristics
相关
加载中…
  • Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan
    Zhang, Guanghui; Xing, Keyi*; Cao, FengInternational Journal of Production Research, 2018, 56(9): 3226-3244.被引 54
  • Supply chain-oriented two-stage assembly flowshops with sequence-dependent setup times
    Pourhejazy, Pourya; Cheng, Chen-Yang; Ying, Kuo-Ching*; Lin, Su-YuanJOURNAL OF MANUFACTURING SYSTEMS, 2021, 61: 139-154.被引 8
  • The Distributed Assembly Permutation Flowshop Scheduling Problem
    Hatami, Sara; Ruiz, Ruben*; Andres-Romano, CarlosInternational Journal of Production Research, 2013, 51(17): 5292-5308.被引 158
查看全部 →

发表信息

论文状态
公开发表
期刊
International Journal of Production Research
发表日期
2023-01-02
卷期
第 61 卷, 第 1 期
页码
258-281
DOI
10.1080/00207543.2020.1842938
语言
MULTI-LANGUAGE
成果收录
SCIE
资助标注
Ministry of Science and Technology, Taiwan [109-2221-E-027-073]

作者

  • Y

    Ying, Kuo-Ching (第一作者)

  • P

    Pourhejazy, Pourya

查看全部 4 位作者收起作者
  • C

    Cheng, Chen-Yang (通讯)

  • S

    Syu, Ren-Siou

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417