摘要
This article presents a comprehensive multi-objective-based optimization problem formulation for finding the optimum size, site, and number of inverter-based DGs (IBDGs) for the operation of the distribution system so as to minimize annual energy cost comprising of costs for the energy loss during the normal operating state, running the IBDGs, substation power including penalty for reverse power flow (if any) and the average energy not supplied as a measure of reliability. Besides, the cost of average apparent load disturbed as a result of voltage sags during faults is also considered. The method is tested on the 33-bus distribution test system using particle swarm optimization. The results so obtained, demonstrate the effectiveness and applicability of the proposed formulation to find the optimum location(s), size(s), and number of IBDG(s) in the radial distribution system with appropriate constraints consideration.
学科与关键词
- Optimal Allocation of Distributed Generation Using Evolutionary Multi-objective OptimizationPriya, P. Pon Ragothama*; Baskar, S.; Selvi, S. Tamil; Babulal, C. K.Journal of Electrical Engineering & Technology, 2023, 18(2): 869-886.被引 6
- Optimal Site and Size of Distributed Generation Allocation in Radial Distribution Network Using Multi-objective OptimizationAli, Aamir*; Keerio, M. U.; Laghari, J. A.Journal of Modern Power Systems and Clean Energy, 2021, 9(2): 404-415.被引 70
- Modelling, applications, and evaluations of optimal sizing and placement of distributed generations: A critical state-of-the-art surveyYang, Bo; Yu, Lei; Chen, Yixuan*; Ye, Haoyin; Shao, Ruining; Shu, Hongchun; Yu, Tao; Zhang, Xiaoshun; Sun, LimingINTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2021, 45(3): 3615-3642.被引 25
