ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

An effective iterated greedy method for the distributed permutation fl owshop scheduling problem with sequence-dependent setup times

Huang, Jiang-Ping; Pan, Quan-Ke*; Gao, Liang华中科技大学; 上海大学
Swarm and Evolutionary Computation2020-12DOI: 10.1016/j.swevo.2020.100742
96被引3阅读
引用收藏
分享

摘要

The distributed permutation flowshop scheduling problem (DPFSP) has attracted much attention in recent years. In this paper, we extend the DPFSP by considering the sequence-dependent setup time (SDST), and present a mathematical model and an iterated greedy algorithm with a restart scheme (IGR). In the IGR, we discard the simulated annealing-like acceptance criterion commonly used in traditional iterated greedy algorithms. A restart scheme with six different operators is proposed to ensure the diversity of the solutions and help the algorithm to escape from local optimizations. Furthermore, to achieve a balance between the exploitation and exploration, we introduce an algorithmic control parameter in the IG stage. Additionally, to further improve the performance of the algorithm, we propose two local search methods based on a job block which is built in the evolution process. A detailed design experiment is carried out to calibrate the parameters for the presented IGR algorithm. The IGR is assessed through comparing with the state-of-the-art algorithms in the literature. The experimental results show that the proposed IGR algorithm is the best-performing one among all the algorithms in comparison.

学科与关键词

关键词
FlowshopSchedulingIterated greedy algorithmMeta-heuristics
相关
加载中…
  • Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times
    Rossi, Fernando Luis*; Nagano, Marcelo SeidoCOMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157: 107337.被引 26
  • Supply chain-oriented two-stage assembly flowshops with sequence-dependent setup times
    Pourhejazy, Pourya; Cheng, Chen-Yang; Ying, Kuo-Ching*; Lin, Su-YuanJOURNAL OF MANUFACTURING SYSTEMS, 2021, 61: 139-154.被引 8
  • An iterated greedy algorithm integrating job insertion strategy for distributed job shop scheduling problems
    Huang, Lin; Tang, Dunbing*; Zhang, Zequn; Zhu, Haihua; Cai, Qixiang; Zhao, ShikuiJOURNAL OF MANUFACTURING SYSTEMS, 2024, 77: 746-763.
查看全部 →

发表信息

论文状态
公开发表
期刊
Swarm and Evolutionary Computation
发表日期
2020-12
卷期
第 59 卷
页码
100742
DOI
10.1016/j.swevo.2020.100742
语言
ENGLISH
期刊收录
NSL.SCIE
期刊等级
1区
成果收录
SCIE
资助标注
National Science Foundation of China [61973203, 51575212]; National Natural Science Fund for Distinguished Young Scholars of China [51825502]; Shanghai Key Laboratory of Power station Automation Technology

作者

  • H

    Huang, Jiang-Ping (第一作者)

    shanghai univ

  • P

    Pan, Quan-Ke (通讯)

    shanghai univ · liaocheng univ

查看全部 3 位作者收起作者
  • G

    Gao, Liang

    huazhong univ sci & technol

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417