ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Part-grouping and build-scheduling with sequence-dependent setup time to minimize the makespan for non-identical parallel additive manufacturing machines

Kim, Yong Jae; Kim, Byung Soo*
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY2022-3DOI: 10.1007/s00170-021-08361-z
13被引8阅读
引用收藏
分享

摘要

This paper addresses a part-grouping and build-scheduling problem for an additive manufacturing process with non-identical parallel additive manufacturing machines. Parts with the same material can be simultaneously manufactured as a build in the machine. The total areas of parts in the build cannot exceed the area capacity of the machine. Each machine has different heights in a build area. The maximum height of parts in the build is less than or equal to the height of each machine in the build area. The processing time of each build is the maximum processing time of parts belonging to the build. When the material is changed in each machine, the setup time occurs. The objective function is minimizing the makespan. To find optimal and near-optimal solutions for the problem, a mixed integer linear programming model and three meta-heuristic algorithms are presented. For small problem instances, the performance of three meta-heuristic algorithms is compared with the optimal value obtained mixed integer linear programming model. For large problem instances, the performance of three meta-heuristic algorithms is compared to each other.

学科与关键词

关键词
Additive manufacturingSchedulingMeta-heuristic algorithmsMixed integer linear programmingSequence-dependent setup time
相关
加载中…
  • Machine scheduling with orientation selection and two-dimensional packing for additive manufacturing
    Che, Yuxin; Hu, Kanxin*; Zhang, Zhenzhen; Lim, AndrewCOMPUTERS & OPERATIONS RESEARCH, 2021, 130: 105245.被引 38
  • Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
    Kim, Jun; Kim, Hyun-Jung*International Journal of Production Research, 2021, 59(18): 5438-5453.被引 25
  • A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines
    Rohaninejad, Mohammad; Tavakkoli-Moghaddam, Reza*; Vahedi-Nouri, Behdin; Hanzalek, Zdenek; Shirazian, ShadiInternational Journal of Production Research, 2022, 60(20): 6205-6225.被引 34
查看全部 →

发表信息

论文状态
公开发表
期刊
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
发表日期
2022-03
卷期
第 119 卷, 第 3-4 期
页码
2247-2258
DOI
10.1007/s00170-021-08361-z
语言
ENGLISH
期刊等级
3区
成果收录
SCIE
资助标注
National Research Foundation of Korea (NRF) - Ministry of Science, ICT and Future [NRF-2019R1F1A1056119]; Incheon National University

作者

  • K

    Kim, Yong Jae (第一作者)

  • K

    Kim, Byung Soo (通讯)

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417