摘要
In order to overcome the contradiction between the rolling stock scheduling problem of EMU at a macro level and the problem of EMU train passing station route at a micro level in some special cases, this paper comprehensively optimizes the electric multiple unit train passing station route and rolling stock scheduling. By taking the operation of the Chinese high-speed railway EMU trains as the actual background and using the actual situation that the first-level inspection and repair cycle time is twice the cycle of a high-speed railway train timetable, based on the establishment of a 48-hour continuous network, a 0-1 type integer linear programming model is constructed. While obtaining the rolling stock scheduling of EMU trains, the EMU train passing station route scheme is obtained. The experimental results show that, compared with solving the problem in two stages, the comprehensive optimization according to the method in this paper can better ensure the feasibility of the passing station route scheme and provide decision support for the actual operation.
学科与关键词
- A Systematic Approach to the High-Level Maintenance Scheduling for High-Speed Trains in ChinaZheng, Wenqiang; Zhang, Hanxiao; Li, Yan-Fu*IEEE TRANSACTIONS ON RELIABILITY, 2023.
- 动车组周转、到发线运用和接发车进路排列方案的综合优化研究郑亚晶; 李雨恒; 李耀辉广东工业大学学报, 2019, (06): 9-15.
- A Schedule-Based Model for Passenger-Oriented Train Planning With Operating Cost and Capacity ConstraintsXie, Jiemin; Zhan, Shuguang*; Wong, Sze Chun; Lo, Siu MingIEEE Transactions on Intelligent Transportation Systems, 2022, 23(11): 21314-21328.被引 2
