ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

A memetic algorithm to address the multi-node resource-constrained project scheduling problem

Machado-Dominguez, Luis F.*; Paternina-Arboleda, Carlos D.; Velez, Jorge, I; Barrios-Sarmiento, Agustin
JOURNAL OF SCHEDULING2021-8DOI: 10.1007/s10951-021-00696-5
6被引4阅读
引用收藏
分享

摘要

The multi-mode resource-constrained project scheduling problem (MRCPSP) is a very general scheduling model. The MRCPSP covers problems where activities can be executed in several ways or modes, and is affected by parameters such as their duration, temporary relationships with other activities, and renewable and non-renewable resource requirements. The objective of the MRCPSP is to select a combination of time/resources to minimize the duration of the project and complete all activities while satisfying all resource constraints and precedence relationships. Here, we describe a memetic algorithm to solve the MRCPSP. This algorithm uses the components of genetic algorithms and variable neighborhoods search to implement (1) an adaptation of the uniform crossover operator, and (2) a local search to assess agents' performance that appropriately guides the evolution of the algorithm and hence generate better solutions. We implement a metaheuristic strategy and compare its performance for solving different instances of the standard PSPLIB and MMLIB libraries. Overall, our memetic algorithm provides suitable solutions for the MRCPSP and shows outstanding performance in all tested instances.

学科与关键词

关键词
Resource-constrained project schedulingMulti-modesMemetic algorithm
相关
加载中…
  • Memetic algorithm for solving resource constrained project scheduling problems
    Rahman, Humyun Fuad*; Chakrabortty, Ripon K.; Ryan, Michael J.AUTOMATION IN CONSTRUCTION, 2020, 111: 103052.被引 65
  • Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman*; Dauzere-Peres, Stephane; Yugma, Claude; Gallais, Cedric; Pouzet, JulietteAnnals of Operations Research, 2024, 338(1): 69-114.被引 4
  • A matheuristic approach to the multi-mode resource constrained project scheduling problem
    Fernandes, Gustavo Alves; de Souza, Sergio Ricardo*COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162: 107592.被引 10
查看全部 →

发表信息

论文状态
公开发表
期刊
JOURNAL OF SCHEDULING
发表日期
2021-08
卷期
第 24 卷, 第 4 期
页码
413-429
DOI
10.1007/s10951-021-00696-5
语言
ENGLISH
期刊收录
NSL
期刊等级
4区
成果收录
SCIE
资助标注
Colombian Agency for Research and Development (COLCIENCIAS) [FP44842-068-2018]; Universidad del Norte, Barranquilla, Colombia

作者

  • M

    Machado-Dominguez, Luis F. (通讯) (第一作者)

  • P

    Paternina-Arboleda, Carlos D.

查看全部 4 位作者收起作者
  • V

    Velez, Jorge, I

  • B

    Barrios-Sarmiento, Agustin

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417