摘要
As an important node of a multimodal container transport hub, the container terminal occupies a critical position in the whole process of container transportation and the global supply chain network. With the increasing size of container vessels, improving the handling efficiency of multiple vessels at berth in a given port becomes a complex problem to solve. We formulate a mixed-integer linear programming model to minimise the vessel services time, the total completion and travel times of quay cranes (QCs) among multiple vessels. To solve the proposed model, we develop a particle swarm optimisation (PSO) algorithm incorporated with a tailored initial-solution generation algorithm. Furthermore, a couple of acceleration strategies are designed to improve the solution quality and shorten computation time. The results of numerical experiments on real-life instances validate the proposed model and the efficiency of the proposed algorithm.
学科与关键词
- Scheduling quay cranes and yard trucks for unloading operations in container portsZhen, Lu; Yu, Shucheng; Wang, Shuaian*; Sun, ZhuoAnnals of Operations Research, 2019, 273(1-2): 455-478.被引 58
- Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumptionHe Junliang*; Huang Youfang; Yan Wei; Wang ShuaianExpert Systems with Applications, 2015, 42(5).
- Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraintsAlsoufi, Ghazwan*; Yang, Xinan; Salhi, AbdellahJournal of the Operational Research Society, 2018, 69(3): 372-383.被引 12
