摘要
This paper proposes a new dynamic algorithm based on simulation approach and multi-objective optimization to solve the FJSP with transportation assignment. The objectives considered in scheduling jobs and transportation tasks in a flexible job shop manufacturing system include makespan, robot travel distance, time difference with due date and critical waiting time. The results obtained from the computational experiments have shown that the proposed approach is efficient and competitive.
学科与关键词
关键词
Flexible job shop schedulingMulti-objective programmingSimulationMulti-agent systemsTransportation
文献加载失败,请重试
重试