ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem

Sonmez, Rifat*; Gurel, Mustafa
JOURNAL OF MANAGEMENT IN ENGINEERING2016-11DOI: 10.1061/(ASCE)ME.1943-5479.0000468
16被引2阅读
引用收藏
分享

摘要

Despite many research efforts that have focused on the multimode resource-constrained project scheduling problem (MRCPSP), very little success has been achieved in solving the problem for large-scale projects. In this paper a new hybrid optimization method is presented to achieve an advancement in optimal planning and scheduling of large-scale construction projects with multiple duration/resource execution modes and resource constraints. The proposed method consists of a novel heuristic and unique genetic optimization algorithm. The heuristic is designed to achieve schedules with efficient resource utilizations through dynamic selection of modes. A genetic optimization algorithm is integrated to the proposed optimization method to further improve the quality of the solutions obtained in the heuristic phase. The computational experiment results reveal that the new hybrid method outperforms the state-of-the-art methods and achieves high-quality solutions in significantly less computation time, especially for large projects. The main contribution of the proposed hybrid optimization method is that it enables significant savings by optimal planning and scheduling of medium- and large-scale construction projects with multiple duration/resource execution modes and resource constraints.

学科与关键词

关键词
Project managementResource managementConstruction planningSchedulingCostsOptimization
相关
加载中…
  • Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang; Li, Haitao*; Xu, Zhe*EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168: 114475.被引 26
  • Hybrid evolutionary algorithm for large-scale project scheduling problems
    Zaman, Forhad*; Elsayed, Saber; Sarker, Ruhul; Essam, DarylCOMPUTERS & INDUSTRIAL ENGINEERING, 2020, 146: 106567.被引 13
  • Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Chu, Zihao; Xu, Zhe*; Xie, FangARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44(3): 2503-2517.被引 4
查看全部 →

发表信息

论文状态
公开发表
期刊
JOURNAL OF MANAGEMENT IN ENGINEERING
发表日期
2016-11
卷期
第 32 卷, 第 6 期
页码
04016020
DOI
10.1061/(ASCE)ME.1943-5479.0000468
语言
ENGLISH
成果收录
SCIE

作者

  • S

    Sonmez, Rifat (通讯) (第一作者)

  • G

    Gurel, Mustafa

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417