ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Effective Improved NSGA-II Algorithm for Multi-Objective Integrated Process Planning and Scheduling

Wen, Xiaoyu; Song, Qingbo; Qian, Yunjie; Qiao, Dongping; Wang, Haoqi*; Zhang, Yuyan; Li, Haozhengzhou univ light ind
Mathematics2023-8DOI: 10.3390/math11163523
4被引11阅读
引用收藏
分享

摘要

Integrated process planning and scheduling (IPPS) is important for modern manufacturing companies to achieve manufacturing efficiency and improve resource utilization. Meanwhile, multiple objectives need to be considered in the realistic decision-making process for manufacturing systems. Based on the above realistic manufacturing system requirements, it becomes increasingly important to develop effective methods to deal with multi-objective IPPS problems. Therefore, an improved NSGA-II (INSGA-II) algorithm is proposed in this research, which uses the fast non-dominated ranking method for multiple optimization objectives as an assignment scheme for fitness. A multi-layer integrated coding method is adopted to address the characteristics of the integrated optimization model, which involves many optimization parameters and interactions. Elite and mutation strategies are employed during the evolutionary process to enhance population diversity and the quality of solutions. An external archive is also used to store and update the Pareto solution. The experimental results on the Kim test set demonstrate the effectiveness of the proposed INSGA-II algorithm.

学科与关键词

关键词
integrated process planning and schedulingmulti-objective optimizationmutation strategyelite strategy
相关
加载中…
  • Multi-objective optimization using improved NSGA-II for integrated process planning and scheduling problems in a machining job shop for large-size valve
    Wang, Junqiang*; Xu, Lihua; Sun, Shuangqiu; Ma, Yunfei; Yu, GuofengPLoS One, 2024, 19(6): e0306024.
  • An Integrated Process Planning and Scheduling problem solved from an adaptive multi-objective perspective
    Haro, Eduardo H.; Avalos, Omar; Galvez, Jorge; Camarena, OctavioJOURNAL OF MANUFACTURING SYSTEMS, 2024, 75: 1-23.被引 2
  • A two-stage solution method based on NSGA-II for Green Multi-Objective integrated process planning and scheduling in a battery packaging machinery workshop
    Wen, Xiaoyu; Wang, Kanghong; Li, Hao*; Sun, Haiqiang; Wang, Haoqi; Jin, LiangliangSwarm and Evolutionary Computation, 2021, 61: 100820.被引 58
查看全部 →

发表信息

论文状态
公开发表
期刊
Mathematics
发表日期
2023-08
卷期
第 11 卷, 第 16 期
页码
3523
DOI
10.3390/math11163523
成果收录
SCIE
资助标注
The authors would like to thank the anonymous reviewers and the editor for their positive comments.

作者

  • W

    Wen, Xiaoyu (第一作者)

    zhengzhou univ light ind

  • S

    Song, Qingbo

    zhengzhou univ light ind

查看全部 7 位作者收起作者
  • Q

    Qian, Yunjie

    zhengzhou univ light ind

  • Q

    Qiao, Dongping

    zhengzhou univ light ind

  • W

    Wang, Haoqi (通讯)

    zhengzhou univ light ind

  • Z

    Zhang, Yuyan

    zhengzhou univ light ind

  • L

    Li, Hao

    zhengzhou univ light ind

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417