ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Robust Fuzzy-Stochastic Programming Model and Meta-Heuristic Algorithms for Dual-Resource Constrained Flexible Job-Shop Scheduling Problem Under Machine Breakdown

Soofi, Parham; Yazdani, Mehdi*; Amiri, Maghsoud; Adibi, Mohammad Amin
IEEE Access2021DOI: 10.1109/ACCESS.2021.3126820
10被引2阅读
引用收藏
分享

摘要

Resource scheduling, job sequencing, and assigning them to available resources are the most critical issues in manufacturing systems, such as flexible job-shop systems. In addition, scheduling uncertainties have attracted significant attention in this field. This study investigates the dual-resource constrained flexible job-shop scheduling (DRCFJSS) problem under machine breakdown and operational uncertainty. Stochastic scenario-based methods were utilized to study the uncertain nature of the problem. Because process times have inherent uncertainty, they are considered fuzzy numbers and are controlled by a credibility-based measure. Robust scheduling must be developed to address unexpected disruptions, such as machine breakdowns and operational risks, such as uncertain process times. Accordingly, a novel robust fuzzy stochastic programming (RFSP) model is presented for this problem. In the proposed RFSP model, the objective function is formulated using a hybrid measure (i.e., a combined average-case and worst-case performance of the manufacturing system) under probable machine breakdown scenarios. Because the DRCFJSS problem is NP-hard, two types of meta-heuristic algorithms, evolutionary population-based, genetic algorithm (GA), and vibration damping optimization (VDO) algorithm, are used for large-sized problems. Then, the proposed RFSP model was applied to a case study, and numerical experiments with randomly generated test problems were used. In small-sized problems, the proposed model is solved using the CPLEX solver, GA and VDO algorithms. Also, the computational study confirms the proper quality of the results of the GA and VDO algorithms in medium and large-sized problems.

学科与关键词

关键词
Electric breakdownJob shop schedulingUncertaintyGenetic algorithmsProgrammingStochastic processesSchedulesDual-resource constrainedflexible job-shop schedulinggenetic algorithmmachine breakdownrobust fuzzy-stochastic programminguncertaintyvibration damping optimization
相关
加载中…
  • Two-stage teaching-learning-based optimization method for flexible job-shop scheduling under machine breakdown
    Buddala, Raviteja*; Mahapatra, Siba SankarINTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 100(5-8): 1419-1432.被引 50
  • Robust scheduling based on extreme learning machine for bi-objective flexible job-shop problems with machine breakdowns
    Yang, Yu; Huang, Min; Wang, Zhen Yu; Zhu, Qi Bing*EXPERT SYSTEMS WITH APPLICATIONS, 2020, 158: 113545.被引 47
  • Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints
    Ren, Weibo; Yan, Yan; Hu, Yaoguang*; Guan, YuInternational Journal of Production Research, 2022, 60(18): 5675-5696.被引 51
查看全部 →

发表信息

论文状态
公开发表
期刊
IEEE Access
发表日期
2021
卷期
第 9 卷
页码
155740-155762
DOI
10.1109/ACCESS.2021.3126820
语言
ENGLISH
期刊收录
NSL
期刊等级
3区
成果收录
SCIE

作者

  • S

    Soofi, Parham (第一作者)

  • Y

    Yazdani, Mehdi (通讯)

查看全部 4 位作者收起作者
  • A

    Amiri, Maghsoud

  • A

    Adibi, Mohammad Amin

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417