ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness

Mahnam, Mehdi; Moslehi, Ghasem; Ghomi, Seyyed Mohammad Taghi Fatemi*
MATHEMATICAL AND COMPUTER MODELLING2013-5DOI: 10.1016/j.mcm.2013.01.007
18被引2阅读
引用收藏
分享

摘要

This paper addresses the problem of minimizing the sum of maximum earliness and tardiness on a single machine with unequal release times and idle insert as realistic assumptions and based on actual manufacturing environments. This problem is shown in the literature that is NP-hard in the strong sense, so there is no polynomial-time algorithm to solve it. Therefore, an exact branch-and-bound scheme is proposed to sequence the jobs by means of efficient dominance rules, lower and upper bounds. Moreover, a polynomial time algorithm to optimally minimize the objective function is developed to insert idle times and schedule the known sequence of jobs in each node of the search tree. To evaluate the efficiency of the proposed algorithm, 720 instances in nine series are randomly generated. Considering the complexity of the problem, the algorithm is capable of solving problems of up to 20 jobs. In addition, two evolutionary metaheuristic algorithms, genetic algorithm and particle swarm optimization, are provided and compared for large-job sizes. Computational results in 3420 randomly generated instances have shown that the proposed genetic algorithm improves the solutions in terms of both quality and time efficiency and that it would be capable of solving the problem of small to large sizes.

学科与关键词

关键词
Single machine schedulingEarliness/tardinessRelease timeBranch-and-boundGenetic algorithmParticle swarm optimization
相关
加载中…
  • Just-in-time scheduling problem with affine idleness cost
    Tan, Zhen*; Fu, GuanqiEUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 313(3): 954-976.被引 1
  • Minimizing the total weighted earliness and tardiness for a sequence of operations in job shops
    Girish, Baby Sivanandan*; Habibullah; Dileeplal, JessammaRAIRO-OPERATIONS RESEARCH, 2022, 56(4): 2621-2649.被引 2
  • Weighted earliness/tardiness parallel machine scheduling problem with a common due date
    Arik, Oguzhan Ahmet*; Schutten, Marco; Topan, EnginEXPERT SYSTEMS WITH APPLICATIONS, 2022, 187: 115916.被引 15
查看全部 →

发表信息

论文状态
公开发表
期刊
MATHEMATICAL AND COMPUTER MODELLING
发表日期
2013-05
卷期
第 57 卷, 第 9-10 期
页码
2549-2563
DOI
10.1016/j.mcm.2013.01.007
语言
ENGLISH
期刊等级
Q1
成果收录
SCIE

作者

  • M

    Mahnam, Mehdi (第一作者)

  • M

    Moslehi, Ghasem

查看全部 3 位作者收起作者
  • G

    Ghomi, Seyyed Mohammad Taghi Fatemi (通讯)

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417