ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

A comprehensive review of batching problems in low-level picker-to-parts systems with order due dates: Main gaps, trade-offs, and prospects for future research

Pinto, Anderson Rogerio Faia; Nagano, Marcelo Seido*
JOURNAL OF MANUFACTURING SYSTEMS2022-10DOI: 10.1016/j.jmsy.2022.08.006
8被引4阅读
引用收藏
分享

摘要

Literature has shown expressive demands for Picking Optimization Methods (POMs) that are better suited to the manual picking systems and Warehouses (WAs). There are still many gaps and trade-offs between the level of customer service and the WA efficiency for the so-called Joint Order Batching, Assignment and Sequencing, and Routing Problem (JOBASRP). Thus, the objective of this manuscript is to provide a literature review on the POMs proposed for the JOBASRP in WAs that deal with low-level picker-to-parts systems together with the order due dates and Stock Keeping Units. In the total of analyzed manuscripts (from 1960 to 2021), metaheuristics together with constructive heuristics obtained the best solutions for the JOBASRP. The most used technique is the Genetic Algorithm (50 %), followed by the Variable Neighborhood Search (40 %) and Iterated Local Search (10 %). The main performance indicators are Total Picking Time, Tardiness in Customer Orders and Computational Processing Time for POMs. In addition, we present a reflection focused on the main gaps, trade-offs, and prospects for improving the level of adaptation and performance demanded for the POMs. This manuscript provides eminent contributions to WAs management theory and practice and to the application of the so-called POMs. The theoretical framework presented summarizes the state of the art, defining the basic guidelines regarding new research opportunities, and supporting managers, students, and researchers in the optimization processes and decision making in WAs. We conclude that broader views on adaptation taxonomies and multi-objective algorithms will guide the inte-gration between different areas of the WAs and the development of better POMs.

学科与关键词

关键词
Order pickingPicking systemsWarehouse managementPicking optimization methodsJoint order batchingassignment andsequencingand routing problem
相关
加载中…
  • Minimizing order picking makespan with multiple pickers in a wave picking warehouse
    Ardjmand, Ehsan*; Shakeri, Heman; Singh, Manjeet; Bajgiran, Omid SaneiINTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 206: 169-183.被引 62
  • Order batching and sequencing for minimising the total order completion time in pick-and-sort warehouses
    Jiang, Xiaowei; Sun, Lijun*; Zhang, Yuankai; Hu, XiangpeiEXPERT SYSTEMS WITH APPLICATIONS, 2022, 187: 115943.被引 7
  • Research on a Dynamic Task Update Assignment Strategy Based on a "Parts to Picker" Picking System
    Liang, Kaibo; Zhou, Li; Yang, Jianglong; Liu, Huwei*; Li, Yakun; Jing, Fengmei; Shan, Man; Yang, JinMathematics, 2023, 11(7): 1684.被引 5
查看全部 →

发表信息

论文状态
公开发表
期刊
JOURNAL OF MANUFACTURING SYSTEMS
发表日期
2022-10
卷期
第 65 卷
页码
1-18
DOI
10.1016/j.jmsy.2022.08.006
语言
ENGLISH
期刊等级
2区
成果收录
SCIE
资助标注
ogico (CNPq) - Brazil [312585/2021-7]; Nacional de Desenvolvimento do Ensino Superior Particular - Brazil [2700441]; Conselho Nacional de Desenvolvimento Cientifico e Tecnologico (CNPq) - Brazil [312585/2021-7]; Fundacao Nacional de Desenvolvimento do Ensino Superior Particular - Brazil [2700441]

作者

  • P

    Pinto, Anderson Rogerio Faia (第一作者)

  • N

    Nagano, Marcelo Seido (通讯)

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417