摘要
Path planning and integrated scheduling are two important problems to be resolved in the design of any automated container terminal. There has been relatively little research, however, on automated guided vehicles (AGVs) conflict-free path planning with quay cranes (QCs) and rail-mounted gantry (RMG) cranes. This paper combines the two problems to realize the integrated scheduling of multi-AGV with conflict-free path planning. A mixed integer programming model based on path optimization, integrated scheduling, and conflicts and dead-locks is established to minimize AGVs delay time under the condition that the task allocation is known. A series of small-scale and large-scale experiments are conducted to validate the availability of Hybrid Genetic Algorithm-Particle Swarm Optimization (HGA-PSO) with fuzzy logic controller to adaptive auto tuning. Dynamic simulation of the path nodes indicates that the proposed model indeed can resolve the AGV conflict and deadlock problem and may be practically applicable to existing automated container terminals.
学科与关键词
- Integrated scheduling optimization of U-shaped automated container terminal under loading and unloading modeXu, Bowei*; Jie, Depei; Li, Junjun; Yang, Yongsheng; Wen, Furong; Song, HaitaoCOMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162: 107695.被引 52
- Application of hybrid GA-PSO based on intelligent control fuzzy system in the integrated scheduling in automated container terminalZhong, Meisu; Yang, Yongsheng*; Zhou, Yamin; Postolache, OctavianJOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 39(2): 1525-1538.被引 16
- Modelling of integrated scheduling problem of capacitated equipment systems with a multi-lane road networkLuan, Di; Zhao, Mingjing*; Zhao, Qianru; Wang, NanPLoS One, 2021, 16(6): e0251875.被引 3
