ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Solving Integrated Process Planning, Dynamic Scheduling, and Due Date Assignment Using Metaheuristic Algorithms

Erden, Caner*; Demir, Halil Ibrahim; Kokcam, Abdullah Hulusi
MATHEMATICAL PROBLEMS IN ENGINEERING2019DOI: 10.1155/2019/1572614
9被引4阅读
引用收藏
分享

摘要

Because the alternative process plans have significant contributions to the production efficiency of a manufacturing system, researchers have studied the integration of manufacturing functions, which can be divided into two groups, namely, integrated process planning and scheduling (IPPS) and scheduling with due date assignment (SWDDA). Although IPPS and SWDDA are well-known and solved problems in the literature, there are limited works on integration of process planning, scheduling, and due date assignment (IPPSDDA). In this study, due date assignment function was added to IPPS in a dynamic manufacturing environment. And the studied problem was introduced as dynamic integrated process planning, scheduling, and due date assignment (DIPPSDDA). The objective function of DIPPSDDA is to minimize earliness and tardiness (E/T) and determine due dates for each job. Furthermore, four different pure metaheuristic algorithms which are genetic algorithm (GA), tabu algorithm (TA), simulated annealing (SA), and their hybrid (combination) algorithms GA/SA and GA/TA have been developed to facilitate and optimize DIPPSDDA on the 8 different sized shop floors. The performance comparisons of the algorithms for each shop floor have been given to show the efficiency and effectiveness of the algorithms used. In conclusion, computational results show that the proposed combination algorithms are competitive, give better results than pure metaheuristics, and can effectively generate good solutions for DIPPSDDA problems.

学科与关键词

关键词
PARTICLE SWARM OPTIMIZATIONOF-THE-ARTHYBRID GENETIC ALGORITHMSINGLE-MACHINEEARLINESS-TARDINESSEVOLUTIONARY ALGORITHMTABU SEARCHSHOPPENALTIESMINIMIZE
相关
加载中…
  • Dynamic integrated process planning, scheduling and due-date assignment using ant colony optimization
    Demir, Halil Ibrahim; Erden, Caner*COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149: 106799.被引 23
  • A modified integer and categorical PSO algorithm for solving integrated process planning, dynamic scheduling, and due date assignment problem
    Erden, C.; Demir, H. I.; Canpolat, O.*Scientia Iranica, 2023, 30(2): 738-756.被引 6
  • Mathematical modeling and two metaheuristic algorithms for integrated process planning and group scheduling with sequence-dependent setup time
    Hosseinzadeh, Mohammad Reza; Heydari, Mehdi*; Mazdeh, Mohammad MahdaviOperational Research, 2022, 22(5): 5055-5105.被引 4
查看全部 →

发表信息

论文状态
公开发表
期刊
MATHEMATICAL PROBLEMS IN ENGINEERING
发表日期
2019
卷期
第 2019 卷
页码
1572614
DOI
10.1155/2019/1572614
语言
ENGLISH
成果收录
SCIE

作者

  • E

    Erden, Caner (通讯) (第一作者)

  • D

    Demir, Halil Ibrahim

查看全部 3 位作者收起作者
  • K

    Kokcam, Abdullah Hulusi

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417