ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Optimization-based scheduling of construction projects with generalized precedence relationships: A real-life case study

Aminbakhsh, Saman*; Ahmed, Ary
Scientia Iranica2025-1DOI: 10.24200/sci.2023.59493.6275
1被引4阅读
引用收藏
分享

摘要

Concomitant reduction of cost and duration is recognized as one of the main aspects of construction planning. Expedition of project schedule naturally incurs extra costs due to implementation of more productive and/or high-price construction techniques. Meanwhile, a reduction in time is usually plausible only down to a certain limit, below which renders expeditions either technically or financially unviable. Thus, striking a reasonable balance between project cost and duration remains a desirable yet challenging task for which there has been a myriad of advancements and literature. Despite the many studies associated with this problem-referred to as Time-Cost Trade-off Problem (TCTP) it is observed that only a few exercise TCTPs with the generalized logical relationships. This observation holds despite the fact that generalized precedence relationships are imperative to introduce parallelism and to secure a realistic overlap among the activities. Tn this regard, a Simulated Annealing-based (SA-based) Genetic Algorithm (GA) as proposed herein, is specifically designed to provide the capability of exerting TCTPs with properly overlapped activities. Efficiency of this algorithm is tested over a range of problems and its performance is validated over a large-scale real-case construction project. Results of the hybridized GA indicate fast and robust convergence to high-quality solutions.

学科与关键词

关键词
OptimizationTime-cost trade-off problemGeneralized precedence relationshipsGenetic algorithmMeta-heuristics
相关
加载中…
  • Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag*Iranian Journal of Science and Technology-Transactions of Civil Engineering, 2020, 44(4): 1295-1307.被引 21
  • Optimizing Three-Dimensional Trade-Off Problem of Time-Cost-Quality over Multi-Mode Projects with Generalized Logic
    Aminbakhsh, Saman*; Abdulsattar, Abdulrahman M.Buildings, 2024, 14(6): 1676.被引 1
  • Modified Streamlined Optimization Algorithm for Time-Cost Tradeoff Problems of Complex Large-Scale Construction Projects
    Wang, Jia*; Han, Congji; Li, XinghuaJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2023, 149(5): 04023022.被引 4
查看全部 →

发表信息

论文状态
公开发表
期刊
Scientia Iranica
发表日期
2025-01
卷期
第 31 卷, 第 19 期
页码
1809-1824
DOI
10.24200/sci.2023.59493.6275
语言
ENGLISH
成果收录
SCIE

作者

  • A

    Aminbakhsh, Saman (通讯) (第一作者)

  • A

    Ahmed, Ary

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417