ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Integration of resource supply management and scheduling of construction projects using multi-objective whale optimization algorithm and NSGA-II

Ghoroqi, Mahyar; Ghoddousi, Parviz*; Makui, Ahmad; Javid, Ali Akbar Shirzadi; Talebi, Saeed
SOFT COMPUTING2024-3DOI: 10.1007/s00500-023-09467-0
1被引1阅读
引用收藏
分享

摘要

This study explores the intricate integration and synchronization of supplier selection with the optimal scheduling of multi-mode resource-constrained projects, which is a genuine and complex challenge prevalent in the construction industry, by proposing new multi-objective mathematical modeling considering various items. Within this context, a multifaceted network of concurrent projects (multi-project) is examined with different suppliers' resources (multi-supplier) to minimize the overall projects' delay times and associated costs. The mathematical model formulation also incorporates diverse implementation modes (multi-mode) and the time value of money (TVM). To use and unravel the complexities of the proposed model, two distinct algorithms, including a multi-objective whale optimization algorithm (WOA) based on the Pareto archive and the well-known non-dominated sorting genetic algorithm II (NSGA-II), are employed. The algorithms were subjected to a comparative analysis of several sample problems and evaluated against multi-objective criteria, including quality metric (QM), diversity metric (DM), spacing metric (SM), number of solutions (NOS), mean Ideal distance (MID), and computational time. The evaluation reveals that the tailored multi-objective WOA outperforms NSGA-II, exhibiting greater solution precision and diversity. The WOA demonstrates an enhanced ability to efficiently explore the problem's feasible solution space, albeit at the increased computational time to pinpoint optimal solutions. Notably, the validity and practicality of the proposed model and method were field-tested within the context of construction projects in Iran, with the obtained results juxtaposed against the real-world data. The comparative analysis indicates that implementing the scheduling approach and solution methodology espoused by the multi-objective WOA led to significant improvements, with financial gains of up to 6% and time savings reaching 16%. Overall, this research substantiates the proposed model and algorithms' benefits in reducing project costs and delays, offering valuable insights for construction industry practitioners.

学科与关键词

关键词
Multi-project schedulingSupply managementMathematical modelingOptimization algorithmsConstruction industry
相关
加载中…
  • An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms
    Ghoroqi, Mahyar; Ghoddousi, Parviz*; Makui, Ahmad; Javid, Ali Akbar Shirzadi; Talebi, SaeedBuildings, 2023, 13(8): 2023.被引 3
  • Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem
    Yilmaz, Mehmet*; Dede, TayfunEngineering Construction and Architectural Management, 2024.
  • Modeling and multi-objective optimization of time, greenhouse gas emissions, and resources for sustainable construction projects
    Hussain, Altaf*; Hussain, IftikharSustainable Production and Consumption, 2023, 39: 269-284.被引 10
查看全部 →

发表信息

论文状态
公开发表
期刊
SOFT COMPUTING
发表日期
2024-03
卷期
第 28 卷, 第 5 期
页码
3793-3811
DOI
10.1007/s00500-023-09467-0
语言
ENGLISH
成果收录
SCIE

作者

  • G

    Ghoroqi, Mahyar (第一作者)

  • G

    Ghoddousi, Parviz (通讯)

查看全部 5 位作者收起作者
  • M

    Makui, Ahmad

  • J

    Javid, Ali Akbar Shirzadi

  • T

    Talebi, Saeed

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417