Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem

Yilmaz, Mehmet*; Dede, Tayfun
Engineering Construction and Architectural Management2024-11-8DOI: 10.1108/ECAM-02-2024-0249
1阅读
引用收藏
分享

摘要

Purpose - The purpose of this study is to enable the planning of construction projects with simultaneous consideration of time, cost and safety risks. It also aims to improve the decision-making process by evaluating the effectiveness of the Rao-2 algorithm in solving multi-objective time-cost-safety risk problems. In the end, this model is designed to support project managers in enhancing management approaches by addressing project challenges and constraints more efficiently. Design/methodology/approach - In this study, the Rao-2 algorithm, along with Grey Wolf Optimization (GWO) and Whale Optimization algorithm (WOA), were improved using the crowding distance-based non-dominated sorting method. Rao-2 was first compared to GWO and WOA. Subsequently, it was compared with well-established algorithms in the literature, including genetic algorithm (GA), particle swarm optimization (PSO) and differential evolution (DE). The C-metric, hypervolume and spread metrics were employed for performance measurement. The performance of the algorithms was evaluated on four case studies consisting of 11, 13, 18 and 25 activities. Findings - The results revealed that Rao-2 performs better than other algorithms as the number of activities increases, when compared using the Hypervolume, Spread and C-metric measures. In terms of performance measures, the GWO algorithm outperformed Rao-2 in some evaluation metrics for the instance involving 11 activities. However, as the number of activities grew, the Rao-2 method consistently generated higher-quality Pareto fronts and outperformed GWO and WOA in all evaluation metrics. The solutions generated by Rao-2 were also superior to those obtained from GA, PSO and DE in all case studies, further demonstrating the capability of our framework to produce a wide range of optimal solutions with high diversity across different case studies. Originality/value - This research demonstrates that Rao-2 not only improves solution quality when generating Pareto fronts but also achieves better results with fewer function evaluations compared to GA, PSO and DE. The algorithm's efficiency makes it particularly well-suited for optimizing time, cost and safety risks in large-scale construction projects, which in turn positions Rao-2 as a better choice for such projects by producing superior results compared to other algorithms. By providing high-quality solutions with reduced computational demands, Rao-2 offers a faster and more resource-efficient tool for decision-making, contributing to advancements in both the theory and practice of construction project management.

学科与关键词

关键词
Time-cost-safety tradeoffRao-2GWOWOA
相关
加载中…
  • Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet*; Dede, TayfunStructures, 2023, 48: 798-808.被引 22
  • Tradeoff different construction project goals in using a novel multi-objective sea horse algorithm
    Nguyen, Duc Anh; Nguyen, Ngoc-Thoan*; Tran, Quangdung; Tran, Duc-HocALEXANDRIA ENGINEERING JOURNAL, 2023, 82: 55-68.被引 2
  • Integration of resource supply management and scheduling of construction projects using multi-objective whale optimization algorithm and NSGA-II
    Ghoroqi, Mahyar; Ghoddousi, Parviz*; Makui, Ahmad; Javid, Ali Akbar Shirzadi; Talebi, SaeedSOFT COMPUTING, 2024, 28(5): 3793-3811.被引 1
查看全部 →

发表信息

论文状态
公开发表
期刊
Engineering Construction and Architectural Management
发表日期
2024-11-08
DOI
10.1108/ECAM-02-2024-0249
成果收录
SCIE

作者

  • Y

    Yilmaz, Mehmet (通讯) (第一作者)

  • D

    Dede, Tayfun

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417