ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Tradeoff different construction project goals in using a novel multi-objective sea horse algorithm

Nguyen, Duc Anh; Nguyen, Ngoc-Thoan*; Tran, Quangdung; Tran, Duc-Hoc
ALEXANDRIA ENGINEERING JOURNAL2023-11-1DOI: 10.1016/j.aej.2023.09.059
2被引5阅读
引用收藏
分享

摘要

Construction project managers aspire to achieve projects of the highest quality while minimizing time and cost. Presently, most trade-off analysis models focus predominantly on the traditional trifecta of time, cost, and quality, often overlooking other pivotal factors and project traits. This study introduces the Chaotic Adaptive Multi-Objective Sea Horse (CAMOSH), an innovative algorithm crafted to navigate the nuanced tradeoffs among time, cost, quality, risk, and environment (TCQRE) in comprehensive construction projects. CAMOSH leverages chaos sequences for population initialization and integrates an adaptive selection technique to harmonize exploitation and exploration during optimization. To facilitate the early-stage project implementation, the multiple-criteria decision analysis (MCDA) method is employed. When benchmarked against six esteemed algorithms across two construction projects, CAMOSH shows its superiority. Statistical evaluation underscores CAMOSH's outstanding performance, evidenced by its top-ranking values in Diversity Measure (DM) and HyperVolume (HV) for both case studies. Furthermore, the algorithm consistently yields solutions with the most optimal Spacing Metric (SM) values and operates in the shortest time frames. These results collectively validate CAMOSH as an instrumental resource, equipping project managers to adeptly balance multifaceted construction project objectives and pinpoint the most effective project timeline.

学科与关键词

关键词
Multi-objective optimizationSEA horse algorithmMulti-criteria decisionProject goals tradeoffGeneralized construction projectsConstruction management
相关
加载中…
  • Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning
    Pham, Vu Hong Son; Dang, Nghiep Trinh Nguyen*; Nam, Nguyen VanEngineering Construction and Architectural Management, 2024.被引 1
  • Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem
    Yilmaz, Mehmet*; Dede, TayfunEngineering Construction and Architectural Management, 2024.
  • Optimizing Three-Dimensional Trade-Off Problem of Time-Cost-Quality over Multi-Mode Projects with Generalized Logic
    Aminbakhsh, Saman*; Abdulsattar, Abdulrahman M.Buildings, 2024, 14(6): 1676.被引 1
查看全部 →

发表信息

论文状态
公开发表
期刊
ALEXANDRIA ENGINEERING JOURNAL
发表日期
2023-11-01
卷期
第 82 卷
页码
55-68
DOI
10.1016/j.aej.2023.09.059
成果收录
SCIE
资助标注
Vietnamese Ministry of Education and Training [B2023-XDA-008]

作者

  • N

    Nguyen, Duc Anh (第一作者)

  • N

    Nguyen, Ngoc-Thoan (通讯)

查看全部 4 位作者收起作者
  • T

    Tran, Quangdung

  • T

    Tran, Duc-Hoc

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417