Hybrid multi-objective evolutionary meta-heuristics for a parallel machine scheduling problem with setup times and preferences

Srinath, Nitin*; Yilmazlar, I. Ozan; Kurz, Mary E.; Taaffe, Kevin
COMPUTERS & INDUSTRIAL ENGINEERING2023-11DOI: 10.1016/j.cie.2023.109675
3被引19阅读
引用收藏
分享

摘要

Fabric dyeing is a vital production process of textile products. In the dyeing process, orders are scheduled to machines, and the sequence of jobs on a machine is crucial since the machines require washing out that depends on the type of consecutive orders. This washing out process is a significant cost factor of the dyeing process because of the chemicals used, which causes sequence dependent setup times. Also, the order of the products to be processed is important in terms of quality that depends on color and shade of the jobs. In this paper, two metaheuristics, namely a non-dominated sorting genetic algorithm (NSGA-II) and multi-objective evolutionary algorithm based on decomposition (MOEA/D) are presented to solve the multi-objective scheduling problem for the dyeing process with sequence dependent setup times, in which the objectives are makespan, tardiness, total number of setups, color preference, and shade difference. Two different gene designs and corresponding feasible schedule generation methods - one heuristic based and one integer programming based, which are integrated within the metaheuristic framework, are proposed. Finally, proposed algorithms are compared based on single and multiple objective analysis. From the tests conducted, we observed that the use of hybrid-optimal approaches integrated within the meta-heuristic frameworks provide higher quality solutions but suffer from longer computation times.

学科与关键词

关键词
Parallel machine schedulingSequence-dependent setup timesMulti-objectiveMetaheuristicsPreferences
相关
加载中…
  • Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    Anjana, V.; Sridharan, R.*; Kumar, P. N.JOURNAL OF SCHEDULING, 2020, 23(1): 49-69.被引 9
  • Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics
    Fadaei, M.; Zandieh, M.*ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38(8): 2233-2244.被引 18
  • An adaptive shuffled frog-leaping algorithm for parallel batch processing machines scheduling with machine eligibility in fabric dyeing process
    Lei, Deming*; Dai, TaoInternational Journal of Production Research, 2024, 62(21): 7704-7721.被引 4
查看全部 →

发表信息

论文状态
公开发表
期刊
COMPUTERS & INDUSTRIAL ENGINEERING
发表日期
2023-11
卷期
第 185 卷
页码
109675
DOI
10.1016/j.cie.2023.109675
语言
MULTI-LANGUAGE
成果收录
SCIE

作者

  • S

    Srinath, Nitin (通讯) (第一作者)

  • Y

    Yilmazlar, I. Ozan

查看全部 4 位作者收起作者
  • K

    Kurz, Mary E.

  • T

    Taaffe, Kevin

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417