Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling

Liu, Dian; Li, Heng; Wang, Hongwei; Qi, Chao*; Rose, Timothy华中科技大学; 上海大学
EXPERT SYSTEMS WITH APPLICATIONS2020-6-15DOI: 10.1016/j.eswa.2020.113230
43被引3阅读
引用收藏
分享

摘要

Construction projects are becoming increasingly larger and more complex in terms of size and cost. An optimization tool is necessary for the construction management system to develop the desired construction schedule to save time and cost. However, only a few efforts have been made to deal with the time-cost trade-off problem (TCTP) in the large-scale construction projects, and the existing optimization methods are slightly limited by the trouble of parameter tuning. As TCTP is known to be an NP-hard problem, this paper aims to introduce a new variant of Symbiotic Organisms Search (SOS) algorithm that does not contain control parameters, called DSOS (Discrete Symbiotic Organisms Search) which generates the parasite organism using a heuristic rule based on the network levels. This enhancement helps to improve the exploration phase and avoid premature stagnation. Performances are evaluated on project instances with different numbers of activities varying from 180 to 6300, as well as nine newly generated project instances with 720 activities but different network structures. The obtained results show a good performance of DSOS in terms of robustness and deviation from optimum in comparison with other meta-heuristics and variants of DSOS without using the heuristic rule. The good performance implies that DSOS is sufficient to serve as an effective tool to generate an optimized construction schedule.

学科与关键词

关键词
Large-scale construction projectDeadline constraintTime-cost trade-offDiscrete symbiotic organisms search
相关
加载中…
  • Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search
    Cheng, Min-Yuan; Prayogo, Doddy; Duc-Hoc Tran*Journal of Computing in Civil Engineering, 2016, 30(3): 04015036.被引 74
  • Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet*; Dede, TayfunStructures, 2023, 48: 798-808.被引 22
  • Optimization-based scheduling of construction projects with generalized precedence relationships: A real-life case study
    Aminbakhsh, Saman*; Ahmed, AryScientia Iranica, 2025, 31(19): 1809-1824.被引 1
查看全部 →

发表信息

论文状态
公开发表
期刊
EXPERT SYSTEMS WITH APPLICATIONS
发表日期
2020-06-15
卷期
第 148 卷
页码
113230
DOI
10.1016/j.eswa.2020.113230
语言
ENGLISH
期刊收录
NSL.SCIE
期刊等级
1区
成果收录
SCIE
资助标注
National Natural Science Foundation of China [71390524, 71821001, 71771096]

作者

  • L

    Liu, Dian (第一作者)

    shanghai univ

  • L

    Li, Heng

    hong kong polytech univ

查看全部 5 位作者收起作者
  • W

    Wang, Hongwei

    huazhong univ sci & technol

  • Q

    Qi, Chao (通讯)

    huazhong univ sci & technol

  • R

    Rose, Timothy

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417