摘要
Process planning and scheduling are two important components of manufacturing systems. This paper deals with a multiobjective just-in-time integrated process planning and scheduling (MOJIT-IPPS) problem. Delivery time and machine workload are considered to make IPPS problem more suitable for manufacturing environments. The earliness/tardiness penalty, maximum machine workload, and total machine workload are objectives that are minimized. The decoding method is a crucial part that significantly influences the scheduling results. We develop a self-adaptive decoding method to obtain better results. A nondominated sorting genetic algorithm with self-adaptive decoding (SD-NSGA-II) is proposed for solving MOJIT-IPPS. Finally, the model and algorithm are proven through an example. Furthermore, different scale examples are tested to prove the good performance of the proposed method.
学科与关键词
- Effective Improved NSGA-II Algorithm for Multi-Objective Integrated Process Planning and SchedulingWen, Xiaoyu; Song, Qingbo; Qian, Yunjie; Qiao, Dongping; Wang, Haoqi*; Zhang, Yuyan; Li, HaoMathematics, 2023, 11(16): 3523.被引 4
- An Integrated Process Planning and Scheduling problem solved from an adaptive multi-objective perspectiveHaro, Eduardo H.; Avalos, Omar; Galvez, Jorge; Camarena, OctavioJOURNAL OF MANUFACTURING SYSTEMS, 2024, 75: 1-23.被引 2
- Hierarchical multistrategy genetic algorithm for integrated process planning and schedulingZhang, Xu; Liao, Zhixue; Ma, Lichao; Yao, Jin*JOURNAL OF INTELLIGENT MANUFACTURING, 2022, 33(1): 223-246.被引 12
