ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

A multi-objective flexible job-shop cell scheduling problem with sequence-dependent family setup times and intercellular transportation by improved NSGA-II

Han, Yaoyao; Chen, Xiaohui*; Xu, Minmin; An, Youjun; Gu, Fengshou; Ball, Andrew D.重庆大学
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE2022-4DOI: 10.1177/09544054211044660
11被引2阅读
引用收藏
分享

摘要

With the development of Industry 4.0 and requirement of smart factory, cellular manufacturing system (CMS) has been widely concerned in recent years, which may leads to reducing production cost and wip inventory due to its flexibility production with groups. Intercellular transportation consumption, sequence-dependent setup times, and batch issue in CMS are taken into consideration simultaneously in this paper. Afterwards, a multi-objective flexible job-shop cell scheduling problem (FJSCP) optimization model is established to minimize makespan, total energy consumption, and total costs. Additionally, an improved non-dominated sorting genetic algorithm is adopted to solve the problem. Meanwhile, for improving local search ability, hybrid variable neighborhood (HVNS) is adopted in selection, crossover, and mutation operations to further improve algorithm performance. Finally, the validity of proposed algorithm is demonstrated by datasets of benchmark scheduling instances from literature. The statistical result illustrates that improved method has a better or an equivalent performance when compared with some heuristic algorithms with similar types of instances. Besides, it is also compared with one type scalarization method, the proposed algorithm exhibits better performance based on hypervolume analysis under different instances.

学科与关键词

关键词
Cellular manufacturing systemflexible job-shop cell schedulingintercellular transportation timessequence-dependent family setup timeenergy consumptionmulti-objective optimization
相关
加载中…
  • MULTI-OBJECTIVE ENERGY-SAVING JOB-SHOP SCHEDULING BASED ON IMPROVED NSGA-II
    Huo, D. X.; Xiao, X. J.; Pan, Y. J.*International Journal of Simulation Modelling, 2020, 19(3): 494-504.被引 14
  • Study on flexible job shop scheduling problem considering energy saving
    Xiao, Yanjun*; Yin, Shanshan; Ren, Guoqing; Liu, WeilingJOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2024, 46(3): 5493-5520.被引 1
  • Research on Multi-Objective Scheduling Algorithm of Job Shop Considering Limited Storage and Transportation Capacity
    Peng, Chengfeng; Li, Zhantao; Zhong, Hongyang; Li, Xiang; Lin, Anping; Liao, Yong*IEEE Access, 2023, 11: 94252-94280.被引 1
查看全部 →

发表信息

论文状态
公开发表
期刊
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE
发表日期
2022-04
卷期
第 236 卷, 第 5 期
页码
540-556
DOI
10.1177/09544054211044660
语言
ENGLISH
期刊等级
3区
成果收录
SCIE
资助标注
Graduate Scientific Research and Innovation Foundation of Chongqing, China [CYB19008]; Fundamental Research Funds for the Central Universities [2019CDCGJX214]

作者

  • H

    Han, Yaoyao (第一作者)

    chongqing univ

  • C

    Chen, Xiaohui (通讯)

    chongqing univ

查看全部 6 位作者收起作者
  • X

    Xu, Minmin

    chongqing univ

  • A

    An, Youjun

    chongqing univ

  • G

    Gu, Fengshou

  • B

    Ball, Andrew D.

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417