摘要
To pursue sustainable development, the manufacturing industry must meet strict requirements on energy-saving. However, the traditional manufacturing mode is not sufficiently green to satisfy such requirements. To solve the problem, this paper attempts to optimize the multi-objective energy-saving job-shop scheduling process. Firstly, a multi-objective optimization model was established to minimize the maximum makespan, total carbon emissions, and total tardiness. Then, the non-dominated sorting genetic algorithm II (NSGA-II) was improved to provide a solution to the multi-objective energy-saving job-shop scheduling problem (JSP). Finally, the effectiveness of the improved NSGA-II for solving the said problem was verified through simulation. The research provides a good reference for improving the greenness of manufacturing mode.
学科与关键词
- Enhanced NSGA-II for multi-objective energy-saving flexible job shop schedulingLuan, Fei; Zhao, Hongxuan; Liu, Shi Qiang*; He, Yixin; Tang, BiaoSustainable Computing-Informatics & Systems, 2023, 39: 100901.被引 10
- Multi-Objective Optimization of Integrated Process Planning and Scheduling Considering Energy SavingsZhang, Xu; Zhang, Hua; Yao, Jin*Energies, 2020, 13(23): 6181.被引 13
- A two-stage solution method based on NSGA-II for Green Multi-Objective integrated process planning and scheduling in a battery packaging machinery workshopWen, Xiaoyu; Wang, Kanghong; Li, Hao*; Sun, Haiqiang; Wang, Haoqi; Jin, LiangliangSwarm and Evolutionary Computation, 2021, 61: 100820.被引 58
