摘要
To achieve green targets, manufacturing enterprises need to propose an effective energy-saving strategy for production scheduling. In this paper, a multi-objective energy-saving flexible job shop-scheduling problem (MO_EFJSP) is formulated with three criteria of optimizing the makespan, the total delay time and the total power consumption. To efficiently solve the MO_EFJSP, an enhanced non-dominated sorting genetic algorithm II (ENSGA-II) is developed. The proposed ENSGA-II has two main innovative aspects: i) the diversity of children population in a local search is achieved by performing different neighborhood search procedures on the sparse solution space so that the accuracy of the current solution is improved; ii) the weighted method is applied to select the desirable compromised solution from the Pareto solution set. By conducting extensive computational experiments based on benchmark instances and real-world case studies, it is verified that the proposed ENSGA-II is applicable for saving power consumption in a flexible job shop system. Consequently, this study makes a significant contribution to the field of green (energy-saving or energy-efficient) production scheduling.
学科与关键词
- MULTI-OBJECTIVE ENERGY-SAVING JOB-SHOP SCHEDULING BASED ON IMPROVED NSGA-IIHuo, D. X.; Xiao, X. J.; Pan, Y. J.*International Journal of Simulation Modelling, 2020, 19(3): 494-504.被引 14
- Adaptive Population NSGA-III with Dual Control Strategy for Flexible Job Shop Scheduling Problem with the Consideration of Energy Consumption and WeightWu, Mingliang; Yang, Dongsheng; Zhou, Bowen; Yang, Zhile*; Liu, Tianyi; Li, Ligang; Wang, Zhongfeng; Hu, KunyuanMachines, 2021, 9(12): 344.被引 15
- Study on flexible job shop scheduling problem considering energy savingXiao, Yanjun*; Yin, Shanshan; Ren, Guoqing; Liu, WeilingJOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2024, 46(3): 5493-5520.被引 1
