ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

Sadati, A.; Moghaddam, R. Tavakkoli*; Naderi, B.; Mohammadi, M.
Iranian Journal of Fuzzy Systems2019-8
8被引2阅读
引用收藏
分享

摘要

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity, in which the number of jobs assigned to each batch on the machine does not violate the machine capacity. The batch processing time, the batch ready time and the batch due date are presented by the longest processing time, the longest ready time and the shortest due date of the jobs that belong to the batch, respectively. To determine the longest and shortest time, the method suggested by Jimnez et al. [18] is used for ranking the fuzzy numbers. A bi-objective fuzzy mixed-integer linear programming model is proposed and solved by two exact methods (i.e., two-phase fuzzy and 6-constraint) for small-sized problems to obtain a set of Pareto solutions. Because the problem belongs to the class NP-hard, two meta-heuristics, namely fuzzy nondominated sorting genetic algorithm (FNSGA-II) and fuzzy multi-objective discrete teachinglearning-based optimization (FMODTLBO), are proposed. Then, the comparison of results is illustrated to show their performances. Furthermore, a new representation of the solutions is a matrix with two rows and N columns (i.e., jobs) used to assign the jobs to the batches that processed on the machines.

学科与关键词

关键词
Batch processingunrelated parallel machines schedulingfuzzy parametersfuzzy multi-objective meta-heuristics
相关
加载中…
  • Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
    Yeh, Wei-Chang; Lai, Peng-Jen; Lee, Wen-Chiung; Chuang, Mei-Chi*Information Sciences, 2014, 269: 142-158.被引 62
  • A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem
    Torabi, S. A.*; Sahebjamnia, N.; Mansouri, S. A.; Bajestani, M. AramonAPPLIED SOFT COMPUTING, 2013, 13(12): 4750-4762.被引 98
  • Parallel machine scheduling with position-based deterioration and learning effects in an uncertain manufacturing system
    Li, Kai; Chen, Jianfu*; Fu, Hong; Jia, Zhaohong; Wu, JunCOMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149: 106858.被引 15
查看全部 →

发表信息

论文状态
公开发表
期刊
Iranian Journal of Fuzzy Systems
发表日期
2019-08
卷期
第 16 卷, 第 4 期
页码
21-40
语言
ENGLISH
成果收录
SCIE

作者

  • S

    Sadati, A. (第一作者)

  • M

    Moghaddam, R. Tavakkoli (通讯)

查看全部 4 位作者收起作者
  • N

    Naderi, B.

  • M

    Mohammadi, M.

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417