ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem

Kannimuthu, Marimuthu*; Raphael, Benny; Ekambaram, Palaneeswaran; Kuppuswamy, Ananthanarayanan
Engineering Construction and Architectural Management2020-4-6DOI: 10.1108/ECAM-03-2019-0156
16被引4阅读
引用收藏
分享

摘要

Purpose Construction firms keep minimal resources to maintain productive working capital. Hence, resources are constrained and have to be shared among multiple projects in an organization. Optimal allocation of resources is a key challenge in such situations. Several approaches and heuristics have been proposed for this task. The purpose of this paper is to compare two approaches for multi-mode resource-constrained project scheduling in a multi-project environment. These are the single-project approach (portfolio optimization) and the multi-project approach (each project is optimized individually, and then heuristic rules are used to satisfy the portfolio constraint). Design/methodology/approach A direct search algorithm called Probabilistic Global Search Lausanne is used for schedule optimization. Multiple solutions are generated that achieve different trade-offs among the three criteria, namely, time, cost and quality. Good compromise solutions among these are identified using a multi-criteria decision making method, Relaxed Restricted Pareto Version 4. The solutions obtained using the single-project and multi-project approaches are compared in order to evaluate their advantages and disadvantages. Data from two sources are used for the evaluation: modified multi-mode resource-constrained project scheduling problem data sets from the project scheduling problem library (PSPLIB) and three real case study projects in India. Findings Computational results prove the superiority of the single-project approach over heuristic priority rules (multi-project approach). The single-project approach identifies better solutions compared to the multi-project approach. However, the multi-project approach involves fewer optimization variables and is faster in execution. Originality/value An integer programming model was developed in this research to optimize the multiple objectives in a multi-project environment considering explicit resource constraints and maximum daily costs constraints. This model was used to compare the performance of the two multi-project environment approaches. Unlike existing work in this area, the model used to predict the quality of activity execution modes is based on data collected from real construction projects.

学科与关键词

关键词
OptimizationSchedulingProject managementDecision support systemsConstruction planning
相关
加载中…
  • Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem
    Sonmez, Rifat*; Gurel, MustafaJOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32(6): 04016020.被引 16
  • Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
    Turkoglu, Harun*; Arditi, David; Polat, GulJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2023, 149(7): 04023056.被引 3
  • An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
    Van Peteghem, Vincent; Vanhoucke, Mario*EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235(1): 62-72.被引 127
查看全部 →

发表信息

论文状态
公开发表
期刊
Engineering Construction and Architectural Management
发表日期
2020-04-06
卷期
第 27 卷, 第 4 期
页码
893-916
DOI
10.1108/ECAM-03-2019-0156
期刊收录
NSL.SSCI.SCIE
期刊等级
3区
成果收录
SCIE
资助标注
Ministry of Human Resource Development (MHRD), India; Swinburne University Postgraduate Research Award (SUPRA), Australia

作者

  • K

    Kannimuthu, Marimuthu (通讯) (第一作者)

  • R

    Raphael, Benny

查看全部 4 位作者收起作者
  • E

    Ekambaram, Palaneeswaran

  • K

    Kuppuswamy, Ananthanarayanan

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417