ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Multi-objective optimization using improved NSGA-II for integrated process planning and scheduling problems in a machining job shop for large-size valve

Wang, Junqiang*; Xu, Lihua; Sun, Shuangqiu; Ma, Yunfei; Yu, Guofeng天津大学
PLoS One2024-6-25DOI: 10.1371/journal.pone.0306024
3阅读
引用收藏
分享

摘要

This paper studied an integrated process planning and scheduling problem from a machining workshop for large-size valves in a valve manufacturing plant. Large-size valves usually contain several key parts and are generally produced in small-series production. Almost all the parts need to be manufactured in the same workshop at the same time in the plant. Facilities have to handle various items in one order, including different models, sizes, and types. It is a classical NP-hard problem on a large scale. An improved NSGA-II algorithm is suggested to obtain satisfactory solutions for makespan and manufacturing costs, which involve large optimization parameters and interactions. A two-section encoding method and an inserting greedy decoding method are chosen to enable the algorithm. The dynamic population update strategy based on dynamic population update and the adaptive mutation technique depending on the population entropy changing rate are selected for enhancing both the solution quality and population diversity. The methodology was successfully implemented in a real-life case at a major valve machining workshop operated by Yuanda Valve Company in China. By taking into account realistic factors and restrictions that have been identified from a real-world manufacturing setting, this technique aids in bridging the knowledge gap between present IPPS research and practical valve production implementations.

学科与关键词

关键词
GENETIC ALGORITHM
相关
加载中…
  • Effective Improved NSGA-II Algorithm for Multi-Objective Integrated Process Planning and Scheduling
    Wen, Xiaoyu; Song, Qingbo; Qian, Yunjie; Qiao, Dongping; Wang, Haoqi*; Zhang, Yuyan; Li, HaoMathematics, 2023, 11(16): 3523.被引 4
  • A two-stage solution method based on NSGA-II for Green Multi-Objective integrated process planning and scheduling in a battery packaging machinery workshop
    Wen, Xiaoyu; Wang, Kanghong; Li, Hao*; Sun, Haiqiang; Wang, Haoqi; Jin, LiangliangSwarm and Evolutionary Computation, 2021, 61: 100820.被引 58
  • An Integrated Process Planning and Scheduling problem solved from an adaptive multi-objective perspective
    Haro, Eduardo H.; Avalos, Omar; Galvez, Jorge; Camarena, OctavioJOURNAL OF MANUFACTURING SYSTEMS, 2024, 75: 1-23.被引 2
查看全部 →

发表信息

论文状态
公开发表
期刊
PLoS One
发表日期
2024-06-25
卷期
第 19 卷, 第 6 期
页码
e0306024
DOI
10.1371/journal.pone.0306024
语言
ENGLISH
成果收录
SCIE
资助标注
Science Research Project of Hebei Education Department of China [ZD2020323]; Natural Science Foundation of Hebei Province of China [E2021108007]

作者

  • W

    Wang, Junqiang (通讯) (第一作者)

  • X

    Xu, Lihua

查看全部 5 位作者收起作者
  • S

    Sun, Shuangqiu

  • M

    Ma, Yunfei

    tianjin univ

  • Y

    Yu, Guofeng

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417