ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Credibility-based chance-constrained multimode resource-constrained project scheduling problem under fuzzy uncertainty

Liu, Huiran; Fang, Zhiming*; Li, Renjieuniv shanghai sci & technol
COMPUTERS & INDUSTRIAL ENGINEERING2022-9DOI: 10.1016/j.cie.2022.108402
9被引1阅读
引用收藏
分享

摘要

This paper investigates a multimode resource-constrained project scheduling problem under hybrid uncertain environment. With the activity durations are fuzzy variables, the resource requests change with the durations. The goal is to minimize the project duration and the cost associated with the required resources. Considering the stochastic duration and resource demand, a chance constrained programming model based on credibility is established. In order to solve the model, the chance constraints and fuzziness are treated by introducing the credibility distribution function and its inverse function. And, a hybrid algorithm combining particle swarm optimization (PSO) and genetic algorithm (GA) is proposed. It has shown fine performance in solving problems with 30, 60, and 120 activities. We also analyze the sensitivity of confidence, fuzziness, number of activities, number of modes, and resource unit cost. Meanwhile, fuzzy value-at-risk is used as a risk measure, and a model based on it is constructed. These numerical results show that the developed algorithm can obtain the near optimal solution of large-scale projects in a reasonable calculation time.

学科与关键词

关键词
Resource constraintMultimode project schedulingUncertaintyCostHeuristic algorithm
相关
加载中…
  • Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang; Li, Haitao*; Xu, Zhe*EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168: 114475.被引 26
  • An efficient hybrid differential evolution based serial method for multimode resource-constrained project scheduling
    Cheng, Min-Yuan; Tran, Duc-Hoc*KSCE Journal of Civil Engineering, 2016, 20(1): 90-100.被引 18
  • Fuzzy-multi-mode Resource-constrained Discrete Time-cost- resource Optimization in Project Scheduling Using ENSCBO
    Kaveh, Ali*; Rajabi, FarivarPeriodica Polytechnica-Civil Engineering, 2022, 66(1): 50-62.被引 7
查看全部 →

发表信息

论文状态
公开发表
期刊
COMPUTERS & INDUSTRIAL ENGINEERING
发表日期
2022-09
卷期
第 171 卷
页码
108402
DOI
10.1016/j.cie.2022.108402
语言
MULTI-LANGUAGE
成果收录
SCIE

作者

  • L

    Liu, Huiran (第一作者)

    univ shanghai sci & technol

  • F

    Fang, Zhiming (通讯)

    univ shanghai sci & technol

查看全部 3 位作者收起作者
  • L

    Li, Renjie

    univ shanghai sci & technol

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417