Fuzzy-multi-mode Resource-constrained Discrete Time-cost- resource Optimization in Project Scheduling Using ENSCBO

Kaveh, Ali*; Rajabi, Farivar
Periodica Polytechnica-Civil Engineering2022DOI: 10.3311/PPci.19145
7被引3阅读
引用收藏
分享

摘要

Construction companies are required to employ effective methods of project planning and scheduling in today's competitive environment. Time and cost are critical factors in project success, and they can vary based on the type and amount of resources used for activities, such as labor, tools, and materials. In addition, resource leveling strategies that are used to limit fluctuations in a project's resource consumption also affect project time and cost. The multi-mode resource-constrained discrete-time-cost-resource optimization (MRC-DTCRO) is an optimization tool that is developed for scheduling of a set of activities involving multiple execution modes with the aim of minimizing time, cost, and resource moment. Moreover, uncertainty in cost should be accounted for in project planning because activities are exposed to risks that can cause delays and budget overruns. This paper presents a fuzzy-multi-mode resource-constrained discrete-time-cost-resource optimization (F-MRC-DTCRO) model for the time-cost-resource moment tradeoff in a fuzzy environment while satisfying all the project constraints. In the proposed model, fuzzy numbers are used to characterize the uncertainty of direct cost of activities. Using this model, different risk acceptance levels of the decision maker can be addressed in the optimization process. A newly developed multi-objective optimization algorithm called ENSCBO is used to search non-dominated solutions to the fuzzy multi-objective model. Finally, the developed model is applied to solve a benchmark test problem. The results indicate that incorporating the fuzzy structure of uncertainty in costs to previously developed MRC-DTCRO models facilitates the decision-making process and provides more realistic solutions.

学科与关键词

关键词
discrete time-cost tradeoffresource-constrained project schedulingresource levelingoptimizationuncertaintiesfuzzy theoryENSCBOconstruction management
相关
加载中…
  • Credibility-based chance-constrained multimode resource-constrained project scheduling problem under fuzzy uncertainty
    Liu, Huiran; Fang, Zhiming*; Li, RenjieCOMPUTERS & INDUSTRIAL ENGINEERING, 2022, 171: 108402.被引 9
  • Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang; Li, Haitao*; Xu, Zhe*EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168: 114475.被引 26
  • Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu*; Raphael, Benny; Ekambaram, Palaneeswaran; Kuppuswamy, AnanthanarayananEngineering Construction and Architectural Management, 2020, 27(4): 893-916.被引 16
查看全部 →

发表信息

论文状态
公开发表
期刊
Periodica Polytechnica-Civil Engineering
发表日期
2022
卷期
第 66 卷, 第 1 期
页码
50-62
DOI
10.3311/PPci.19145
语言
ENGLISH
期刊等级
4区
成果收录
SCIE

作者

  • K

    Kaveh, Ali (通讯) (第一作者)

  • R

    Rajabi, Farivar

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417