ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Integrated decision making for parts ordering and scheduling of jobs on two-stage assembly problem in three level supply chain

Yavari, Mohammad*; Isvandi, Sahar
JOURNAL OF MANUFACTURING SYSTEMS2018-1DOI: 10.1016/j.jmsy.2017.12.002
16被引3阅读
引用收藏
分享

摘要

This paper presents an integrated model for two-stage assembly scheduling problem with ordering the required parts in three-level supply chain including parts' suppliers, components' manufacturers and an assembler. It considers the quantity and date of parts' order as decision variables to make the problem seem more realistic. A mixed-integer linear programming model is proposed to minimize sum of the total weighted completion time, parts ordering and holding cost. A genetic algorithm (GA) based heuristic is proposed to solve the problem efficiently since it is NP-hard, whose solutions are compared with those of CPLEX. Computational experiments were conducted through a diverse range of problem instances indicating that the GA performs much better than CPLEX regarding the average percentage of improvement, ranging from 2.96% to 37.70%, and CPU time. The existing study has considered the effect of machine specific and shared parts aligned with integrated decisions. Results indicate that, adding more of both specific and shared parts and increasing the number of jobs lead to dramatic decrease in the performance of CPLEX in comparison with GA. As the results reveal, the integrated model provides enhancements for the supply chain performance up to 8.16%. Furthermore, the permutation and non-permutation types of the problem are analyzed. The obtained Results show that permutation schedules are not sufficient to solve two-stage assembly scheduling problem within inventory constraints.

学科与关键词

关键词
Two-stage assembly problemInventorySchedulingMixed-integer linear programmingGenetic algorithm
相关
加载中…
  • A two-stage stochastic supply chain scheduling problem with production in cellular manufacturing environment: A case study
    Esmailnezhad, B.; Saidi-Mehrabad, M.*Scientia Iranica, 2023, 30(4): 1399-1422.被引 3
  • Supply chain-oriented two-stage assembly flowshops with sequence-dependent setup times
    Pourhejazy, Pourya; Cheng, Chen-Yang; Ying, Kuo-Ching*; Lin, Su-YuanJOURNAL OF MANUFACTURING SYSTEMS, 2021, 61: 139-154.被引 8
  • Supply chain-oriented permutation flowshop scheduling considering flexible assembly and setup times
    Ying, Kuo-Ching; Pourhejazy, Pourya; Cheng, Chen-Yang*; Syu, Ren-SiouInternational Journal of Production Research, 2023, 61(1): 258-281.被引 31
查看全部 →

发表信息

论文状态
公开发表
期刊
JOURNAL OF MANUFACTURING SYSTEMS
发表日期
2018-01
卷期
第 46 卷
页码
137-151
DOI
10.1016/j.jmsy.2017.12.002
语言
ENGLISH
期刊等级
Q1
成果收录
SCIE

作者

  • Y

    Yavari, Mohammad (通讯) (第一作者)

  • I

    Isvandi, Sahar

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417