ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects

Turkoglu, Harun*; Arditi, David; Polat, Gul
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE2023-7-1DOI: 10.1061/JCEMD4.COENG-13209
3被引14阅读
引用收藏
分享

摘要

As construction projects become more complex and challenging to execute, project managers need to develop work schedules that consider as many objectives as are critical to project success. A work schedule designed to optimize all these objectives is likely to enhance project performance. However, achieving a balance among these objectives is difficult because they frequently conflict with each other. Many optimization models have been developed over the years that can factor in different objectives. Although previous optimization studies have contributed to the body of knowledge by individually adding one or two objectives to the classical time-cost trade-off (TCT) problem, none of these studies simultaneously optimized more than three or four objectives at a time. Clearly, there is a need for a multiobjective optimization model to generate work schedules that increase the likelihood of achieving as many project objectives as necessary. This study was motivated by the need to fill this research gap. The objective of this study was to develop a mathematical multiobjective optimization model for the time-cost-quality-schedule flexibility-resource fluctuation trade-off problem in small-scale construction projects. The proposed model is novel because it (1) considers five important objectives of construction project scheduling at the same time, (2) quantifies all objectives to provide an accurate reflection of construction site conditions, and (3) objectively determines the optimal compromise solution using a distance-based method rather than subjectively from a set of Pareto-optimal solutions. The applicability of the proposed model is demonstrated with an illustrative example. The key results of this study are as follows: (1) the optimal solution obtained depends on the project manager's priorities relative to the objectives; and (2) in optimization problems with more than two objectives, considering the objectives one at a time may result in misleading solutions, because the effects of the other objectives are ignored in this optimization. Consequently, multiple objectives must be considered simultaneously rather than one at a time. The proposed model is expected to provide project managers with a work schedule that balances five or more objectives, increasing the chances of successful project performance.

学科与关键词

关键词
Construction projectsMultiobjectiveOptimizationSchedulingTrade-off problem
相关
加载中…
  • Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun*; Arditi, David; Polat, GulJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2024, 150(5): 04024031.被引 2
  • Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu*; Raphael, Benny; Ekambaram, Palaneeswaran; Kuppuswamy, AnanthanarayananEngineering Construction and Architectural Management, 2020, 27(4): 893-916.被引 16
  • Time-cost-quality tradeoff considering resource-scheduling problems
    Elkliny, Ali F.*; Sanad, Haytham M.; Etman, Emad E.Ain Shams Engineering Journal, 2023, 14(11): 102524.被引 3
查看全部 →

发表信息

论文状态
公开发表
期刊
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
发表日期
2023-07-01
卷期
第 149 卷, 第 7 期
页码
04023056
DOI
10.1061/JCEMD4.COENG-13209
语言
ENGLISH
成果收录
SCIE

作者

  • T

    Turkoglu, Harun (通讯) (第一作者)

  • A

    Arditi, David

查看全部 3 位作者收起作者
  • P

    Polat, Gul

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417