ScholarMate
English简体中文繁體中文
客服热线:400-1616-289
登录注册
期刊论文

A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem

Elloumi, Sonda*; Fortemps, Philippe
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH2010-8-16DOI: 10.1016/j.ejor.2009.12.014
70被引6阅读
引用收藏
分享

摘要

We consider the multi-mode resource-constrained project scheduling problem (MRCPSP), where a task has different execution modes characterized by different resource requirements. Due to the nonrenewable resources and the Multiple modes, this problem is NP-hard: therefore, we implement an evolutionary algorithm looking for a feasible solution minimizing the makespan. In this paper, we propose and investigate two new ideas. On the one hand, we transform the problem of single objective MRCPSP to bi-objective one to cope with the potential violation of nonrenewable resource constraints. Relaxing the latter constraints allows to visit a larger solution set and thus to simplify the evolutionary operators. On the other hand, We build the fitness function not on a priori grid of the bi-objective space, but on an adaptive one relying on Clustering techniques. This proposed idea aims at more relevant fitness values. We show that a clustering-based fitness function can be an appealing feature in multi-objective evolutionary algorithms since it may promote diversity and avoid premature convergence of the algorithms. Clustering heuristics require certainly computation time, but they are still competitive with respect to Classical niche formation multi-objective genetic algorithm.

学科与关键词

关键词
Project schedulingResource-constrainedMultiple modesEvolutionary algorithmsBi-objective approachClustering
相关
加载中…
  • Hybrid evolutionary algorithm for large-scale project scheduling problems
    Zaman, Forhad*; Elsayed, Saber; Sarker, Ruhul; Essam, DarylCOMPUTERS & INDUSTRIAL ENGINEERING, 2020, 146: 106567.被引 13
  • An efficient hybrid differential evolution based serial method for multimode resource-constrained project scheduling
    Cheng, Min-Yuan; Tran, Duc-Hoc*KSCE Journal of Civil Engineering, 2016, 20(1): 90-100.被引 18
  • A memetic algorithm to address the multi-node resource-constrained project scheduling problem
    Machado-Dominguez, Luis F.*; Paternina-Arboleda, Carlos D.; Velez, Jorge, I; Barrios-Sarmiento, AgustinJOURNAL OF SCHEDULING, 2021, 24(4): 413-429.被引 6
查看全部 →

发表信息

论文状态
公开发表
期刊
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
发表日期
2010-08-16
卷期
第 205 卷, 第 1 期
页码
31-41
DOI
10.1016/j.ejor.2009.12.014
语言
ENGLISH
成果收录
SCIE

作者

  • E

    Elloumi, Sonda (通讯) (第一作者)

  • F

    Fortemps, Philippe

登录解锁更多功能

  • 收藏这篇,随时在“我的 · 收藏”找回
  • 认领你的成果,生成推广素材
  • 关注作者获取最新成果
  • 加入项目组、协同写作
注册 / 登录

产品服务

  • 科研之友
  • 创新城
  • 科创云

服务支持

  • 帮助中心
  • 隐私政策
  • 服务条款

联系方式

在线客服:【】
客服热线:400-1616-289
电子邮箱:support@scholarmate.com

关注或下载科研之友

微信二维码
微信公众号
客户端下载二维码
下载客户端
科研成果科研人员科研机构科研动态爱瑞思软件

©2026 深圳市科研之友网络服务有限公司

公安备案图标粤公网安备 44030502000213
粤ICP备 16046710 号粤B2-20110417